Municipal Work Orders & Performance Records

Audited DISCOM utility metrics across municipal water works, continuous pumping stations, and regional distribution schemes.

Municipal water works continuous duty pump house and high-head electric motors
💧 Heavy Pumping Station Motor Drives & Headworks
Utility digital electricity billing meter and power quality logger
📊 Utility Billing Meter Verification & Power Factor Logging
🔍
Mansa Municipality (Gujarat)

Mansa Municipality Water Works (Site 1)

Continuous Water Pumping Substation
Annual Financial Savings
₹ 15,00,000 / yr
Power Factor Improvement: 0.656 → 0.990
Maximum Demand (MD): Reduced by 46 MD
Effective Unit Rate: ₹8.31 → ₹6.44 / unit
Balashinor Municipality (Gujarat)

Balashinor Municipality Water Works (Site 1)

Municipal Pumping Station
Annual Financial Savings
₹ 10,07,831 / yr
Power Factor Improvement: 0.839 → 0.983
Maximum Demand (MD): 174 → 143 MD
Reactive Units Reduction: Down 37,734 units / mo
Petlad Municipality (Gujarat)

Petlad Municipality Water Works

Urban Water Distribution Facility
Annual Financial Savings
₹ 9,60,000 / yr
Power Factor Improvement: 0.808 → 0.996
Effective Unit Rate: ₹7.07 → ₹6.33 / unit
Maximum Demand (MD): 235 → 184 MD
Reactive Units Reduction: Down 57,000 units / mo
Balashinor Municipality (Gujarat)

Balashinor Municipality (2nd Installation)

Auxiliary Pumping Station
Annual Financial Savings
₹ 8,11,944 / yr
Power Factor Improvement: 0.697 → 0.992
Maximum Demand (MD): 107 → 55 MD
Reactive Units Reduction: Down 25,515 units / mo
Mansa Municipality (Gujarat)

Mansa Municipality (2nd Installation)

Secondary Distribution Pump House
Annual Financial Savings
₹ 7,80,000 / yr
Power Factor Improvement: 0.850 → 0.980
Maximum Demand (MD): Reduced by 42 MD
Effective Unit Rate: ₹6.72 → ₹6.58 / unit
Dehgam Municipality (Gujarat)

Dehgam Municipality Water Works

Headworks Pumping Facility
Annual Financial Savings
₹ 4,80,000 / yr
Power Factor Improvement: 0.870 → 0.980
Maximum Demand (MD): 206 → 170 MD
Reactive Units Reduction: Down 35,000 units / mo
Nand Water Works

Nand Water Works Supply Project

Regional High-Capacity Water Line
Monthly Financial Savings
≈ ₹ 3,79,444 / mo
Unit Rate Reduction: 73 paise / unit saved
Annualized Savings: ≈ ₹ 45.5 Lakhs / yr
Vilayat Water Works

Vilayat Water Works Installation

Industrial Water Supply Network
Overall Energy Reduction
11.0% Savings
Maximum Demand (MD): Reduced by 11.0%
Line Current Reduction: Down 13.0% (Amps)
Monthly Bill Savings: ≈ ₹ 26,500 / month
Saraswati Water Works

Saraswati (Old) Water Works

Intake Well Pumping Station
Monthly Financial Savings
≈ ₹ 81,000 / mo
Line Current Reduction: 10.0% Current Cut
Maximum Demand (MD): 7.5% MD Reduction
Unit Rate Benefit: 12 paise / unit saved
Bhersam Water Works

Bhersam Water Works Project

High-Demand Pumping Scheme
Consumption Reduction
5.0% Net Reduction
MD Load Management: Controlled despite higher duty cycle
System Stability: Eliminated overload trips

Comprehensive Verification Matrix — Logged Discom Billing Metrics

[ AUDITED UTILITY RECORDS ]
Facility / Municipality Annual / Monthly Savings Power Factor (Before → After) Maximum Demand (MD) Impact Reactive Units / Losses Impact Key Operational Gain
Mansa Municipality (Site 1) ₹ 15,00,000 / yr 0.656 → 0.990 Reduced by 46 MD Drastic reactive cut Rate: ₹8.31 → ₹6.44 / unit
Balashinor Municipality (Site 1) ₹ 10,07,831 / yr 0.839 → 0.983 174 → 143 MD -37,734 units / mo Eliminated low-PF penalty
Petlad Municipality Water Works ₹ 9,60,000 / yr 0.808 → 0.996 235 → 184 MD -57,000 units / mo Rate: ₹7.07 → ₹6.33 / unit
Balashinor Municipality (Site 2) ₹ 8,11,944 / yr 0.697 → 0.992 107 → 55 MD -25,515 units / mo Near unity PF achieved
Mansa Municipality (Site 2) ₹ 7,80,000 / yr 0.850 → 0.980 Reduced by 42 MD Thermal cable relief Rate: ₹6.72 → ₹6.58 / unit
Dehgam Municipality Water Works ₹ 4,80,000 / yr 0.870 → 0.980 206 → 170 MD -35,000 units / mo Stabilized water works line
Nand Water Works ≈ ₹ 3,79,444 / mo High PF maintained Controlled Peak MD Line loss minimization 73 paise / unit saved
Vilayat Water Works 11.0% Total Savings Optimized phase angle -11.0% MD reduction -13.0% current reduction ≈ ₹ 26,500 / month savings
Saraswati (Old) Water Works ≈ ₹ 81,000 / mo Regulated supply -7.5% MD reduction -10.0% current reduction 12 paise / unit saving
Bhersam Water Works 5.0% Net Savings Regulated Peak MD controlled Reduced motor heating Stable pump operation